Donate

New Building Gallery

New Construction!

roof runoff pipe e s floor in 3rd&4th e s boys bathroom tile finished e s gable vents installed e s circular driveway e s floor going in 5th-6th loam spread north side e s 1st & 2nd e s girls bathroom e s spreading topsoil e s drainage ditch e s south side rocks e s a sink in every classroom e s 1st pillar e s moonscape view e s math room to be finished e s east wing hallway near finished detail finish work welcome door e s rain gardens e s boulder view e s 5th-6th lights ceiling trim e s classroom ceiling & trim e s directors office e s door work entrance e s from west e s front pond view e s K classroom e s kitchen e s music-conferenced room e s preschool e s wainscoting going up admin office e s corner 5th-6th classroom e s main entrance e s trim 5th-6th windows e s after nor'easter e admin offices e main entranceway eJPG painting the preschool classroom e staining wainscoting e 1st&2nd classroom paint e e. classrooms sided e early childhood hallway 1e (1) hallway being painted e parent nook & main entrance e playground side e preschool classroom exterior e sheetrock hallway worker e s west hallway view e 1-12-18 SE Classroom Insulated and Ready for Sheetrock 5th-6th insulated e 12-22-17 Ductwork Installation in SE Wing 12-22-17 Fire Alarm Panel In Mechanical Room 12-29-17 Mechanical Room 12-29-17 SE Wing Hallway Cabinet Heater 12-29-17 South Elevation preschool classroom painted trim e richard in 5th-6th e siding painted inside e utility room e ventilation system e 3rd &4th classroom e s front entrance new roof e s main entrance close e s 11-21-17 south playground entrance close up e south playground entrance distance e south side view e septic in e s 3 classrooms roofs windows s 5th-6th room window s south side roofs sm preparing septic e s East Side Roofing 10-13-17 Main Entrance 10-13-17 Main Entrance Framing 10-13-17 North Wing Framing 10-13-17 roofs on 3 classrooms e s Interior South Entrance 10-13-17 South Side 10-6-17 5 classrooms 9-2-17 5 classrooms SW view 9-2-17 preschool and K-1 classrooms 9-2-17 3 classrooms from south Connector Roof Between Classrooms in SE Wing IMG_5437 IMG_5450 SE Wing Classroom Interior Interior of 5th-6th Classroom 5th-6th Classroom Framing SW Wing Placing the West Wing Slab SE Wing Slab Completed Completed SE Wing Slab Ready for Framing

Ground Breaking Ceremony

alum and parent Kids at ceremony in rain Thank you Walt Thornton  Engineer and VS board member Cropped groundbreaking Cropped shovelers e VS groundbreaking Jim Farnham performing ceremonial  sprinkling on foundation large group ground breaking e Rise Richardson VS Director and  kids recognizing Walt Thonton teachers groundbreaking The A Team 2nd-3rd pile up e (1)

Original Drawings

New Building Floor Plan New Building Landscaping